Sport Investors League
  • Politics
  • Stocks
  • Investing
  • Business

Sport Investors League

  • Politics
  • Stocks
  • Investing
  • Business
Investing

Black Mountain: Strategy & Drilling Plans

by admin October 3, 2024
October 3, 2024
Black Mountain: Strategy & Drilling Plans

Chariot Corp Limited (ASX:CC9) (“Chariot” or the “Company”) today announces that it has revised its strategy for the Black Mountain hard rock lithium project in Wyoming U.S.A. (“Black Mountain”) and will shift from exploring for a large-scale resource to testing the viability of establishing a smaller-scale “pilot mine” at Black Mountain (“Pilot Mine”), with the goal of supplying spodumene concentrate to several lithium hydroxide refineries under construction in the southwestern United States.

HIGHLIGHTS:

NEW STRATEGY: Chariot has revised its strategy for Black Mountain and now envisions a ”Pilot Mine” at Black Mountain in Wyoming, U.S.A., that could rapidly produce spodumene concentrate to capitalize on the growing lithium supply deficit in the U.S. marketRESOURCE DEFINITION TARGET: Phase 2 drilling aims to define a high-priority, small-scale lithium resource (minimum JORC (2012) Indicated category) to underpin the Pilot Mine and establish the foundation for future larger-scale resource definitionPHASE 2 DRILL PROGRAM: Chariot will conduct a reverse circulation drilling program at Black Mountain, drilling a total of up to 43 holes and up to 4,300 metres of total drilling (which may be completed in stages through the balance of 2024 and early 2025)METALLURGICAL TESTING: Chariot has approximately 200 kg of mineralized HQ diamond drill core in storage in Wyoming which will be transported to Perth for metallurgical testing by an experienced Perth-based metallurgical laboratory facilityURGENT SUPPLY NEEDS: U.S. lithium demand is projected to surge by 2030, creating an urgency for new domestic supply sourcesWYOMING’S STRATEGIC ADVANTAGE: Wyoming’s small-mine permit system offers a pathway for the establishment of a pilot mineCOST-EFFICIENT MODULAR PLANT DESIGN: The contemplated modular plant design is expected to reduce upfront costs and offer flexibility to scale up rapidlyLONG-TERM VISION: The Pilot Mine strategy could provide short-term cash flow and potentially could optimize the development of larger-scale mining operations in the future

The following factors relating to the Black Mountain Project render it particularly suitable for the establishment of a Pilot Mine:

1) Indications of near-surface lithium mineralization at Black Mountain makes it suitable for a shallow, open-pit Pilot Mine.

2) Wyoming’s advantageous small-mine permit system offers a pathway for small mine permits that does not impose limits on the mineral volume which can be extracted but rather places annual limits on the mining activities to 10 acres (4.05 hectares) of disturbance and 35,000 cubic yards (26,760 cubic metres) of overburden removal (refer Part 3 of this announcement).

3) Black Mountain’s proximity to U.S. lithium hydroxide refineries currently under construction in the southwestern United States is expected to provide a geographic advantage in marketing product extracted from the Pilot Mine.

1. Target Small-scale Lithium Resource Definition

The Black Mountain Phase 2 drilling program (“Phase 2 Drilling Program”) will be completed during the coming months within the 5 acre disturbance limit applicable under the existing “Notice of Intent” level drill permit. The Phase 2 Drilling Program will seek to:

1) Quickly and cost-effectively define a small-scale lithium resource (at a minimum JORC (2012) “Indicated” category level of confidence) to support the construction of a Pilot Mine (“Small-scale Lithium Resource”).

2) Advance the understanding of mineralization and geology to identify drilling targets for further exploration of the project and delineation of a resource to support future large-scale mining.

The Phase 2 Drilling Program will be focused on the two southern pegmatite outcrops (Figure 1) which exhibit high fractionation (see Chariot’s ASX announcements dated 2 February 2024 and 20 August 2024) and contain spodumene at surface.

A previous drilling program conducted by the Company has already shown at and near-surface lithium mineralisation in these areas (see Chariot’s ASX announcement dated 2 February 2024).

ERM (see Part 4 of this announcement below) has assisted in the development of the Phase 2 Drilling Program. It will consist of up to 43 holes, totaling up to 4,300m of total drilling depth. The drilling method utilized will be small-format reverse circulation (”RC”) drilling, which is a proven method for quick and cost-effective drilling with a minimal disturbance footprint.

As part of its revised strategy for Black Mountain, the Company is replacing the previously announced drilling plans (see Chariot’s ASX announcements dated 19 June 2024) with the Phase 2 Drilling Program.

The Company is in discussions with a drilling company and will commence drilling as soon as an RC drill rig and crew can be redeployed from their current projects.

The Company notes that completion of the full Phase 2 Drilling Program will require additional funding. Discussions regarding potential fundraising are currently underway and the Company will provide further updates as details are finalised.

Click here for the full ASX Release

This post appeared first on investingnews.com

0
FacebookTwitterGoogle +Pinterest
previous post
Springdale Continues to Build with Further Spectacular Diamond Drilling Assays
next post
Red Metal Resources Announces Grant of Stock Options

Related Posts

More high-grade assays pave way for resource at...

June 10, 2025

Top 4 Vanadium-producing Countries

May 30, 2025

Presenting on the Emerging Growth Conference 76 Day...

October 29, 2024

Trump Admin Fast Tracks Anfield’s Velvet-Wood Uranium Project...

May 16, 2025

Strategy for Cuban Mining Joint Venture

July 1, 2024

Radiopharm achieves Nasdaq listing of ADS

November 27, 2024

Galan’s Mineral Resources grow to 9.5 Mt LCE

January 29, 2025

Newmont to Sell Cripple Creek & Victor Mine...

December 11, 2024

West High Yield (W.H.Y.) Resources Ltd. Announces First...

September 28, 2024

Theia Diamond Drilling Delivers Best Result Yet

January 28, 2025

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent

    • A Wild Ride For the History Books: 2025 Mid-Year Recap

      July 24, 2025
    • Is META Breaking Out or Breaking Down?

      July 24, 2025
    • Details of Trump’s highly anticipated AI plan revealed by White House ahead of major speech

      July 24, 2025
    • Iran doubles down on refusal to end nuclear program, ready for war with Israel

      July 24, 2025
    • Johnson erupts over ‘dangerous’ Biden ‘cover-up’ as Democrats push Epstein disclosure

      July 24, 2025

    Categories

    • Business (1,032)
    • Investing (2,680)
    • Politics (3,300)
    • Stocks (1,152)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sportinvestorsleague.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 sportinvestorsleague.com | All Rights Reserved