Sport Investors League
  • Politics
  • Stocks
  • Investing
  • Business

Sport Investors League

  • Politics
  • Stocks
  • Investing
  • Business
Investing

HMW Project Update

by admin July 12, 2024
July 12, 2024
HMW Project Update

Galan Lithium Limited (ASX: GLN) (Galan or the Company) is pleased to provide a further update on the progress at its 100% owned Hombre Muerto West (HMW) Phase 1 lithium brine project. Lithium inventories continue to build in the HMW Phase 1 ponds, in line with Feasibility Study expectations, which will provide the feedstock for the HMW processing plant. Over the last month, Galan has re-worked its construction activities to preserve cash with a view to procuring both a definitive sales agreement and an associated funding package for the Project in the short term.

In situ lithium mining inventory continues to build with over 2,800t LCE accumulating in ponds.
Overall project completion is close to 40%.Project construction continues to advance at a pace commensurate with preserving cash. First production from HMW is now targeted for H2 2025.Average brine flow rate, well lithium grade and evaporation rates are in line with or better than those utilised in the Phase 1 Feasibility Study.Pond inventory management system in place to protect inventory and optimise evaporation process.Offtake partners shortlisted with Galan progressing towards a definitive sales agreement and associated funding package.

Overall completion of the HMW Phase 1 project now sits at approximately 40% with the ponds system at 60% capacity. The designed ponds system can allow an inventory, until H2 2025, of up to 10,000tpa LCE without the need for processing. Approximately 750,000 m2 of evaporation area has now been built, currently housing 2,800t LCE contained inventory. This current evaporation area is sufficient to produce a lithium chloride volume of approximately 3.0 ktpa LCE. The key processing parameters, including brine well average flow rates, lithium grades and evaporation rates are all aligned with the Phase 1 DFS. Due to the slower pace of construction activities, first production from HMW is now expected to be within H2 2025.

As previously announced, the HMW project was separated into four production phases. The initial Phase 1 Definitive Feasibility Study (DFS) focused on the production of 5.4ktpa LCE of a lithium chloride concentrate by H2 2025, as governed by the approved production permits. The Phase 2 DFS targets 21ktpa LCE of a lithium chloride concentrate in 2026, followed by Phase 3 production of 40ktpa LCE by 2028 and finally a Phase 4 production target of 60ktpa LCE by 2030. Phase 4 will include lithium brine sourced from both HMW and Galan’s other 100% owned project in Argentina, Candelas. The positive Phase 2 DFS results were announced on 3 October 2023 (https://wcsecure.weblink.com.au/pdf/GLN/02720109.pdf).

Galan’s Managing Director, Juan Pablo (JP) Vargas de la Vega, commented:

“We are very proud of the solid progress made to date especially in light of current market conditions. During this time, the Board also made the prudent decision to strategically slow construction activities so as to preserve our cash.

Our current in situ inventory of 2,800t LCE has been the first step of our production pathway. Our inventory will continue to increase as we have a low energy cost operation that only requires brine pumps to operate. As a result, once Galan finalises sales and funding arrangements, which are progressing well, the Company will be in a strong position to produce a competitive low-cost lithium product.

It should also be noted that we have received strong international market interest in our HMW lithium concentrate. In our view, this evidence indicates that the current lithium pricing environment and market oversupply is not expected to be a long term trend.”

Click here for the full ASX Release

This post appeared first on investingnews.com

0
FacebookTwitterGoogle +Pinterest
previous post
AI Stocks: 9 Biggest Companies in 2024
next post
Strategic Project Review Commenced: Gold and Copper Potential

Related Posts

NOVONIX Signs Synthetic Graphite Offtake Deal with Volkswagen’s...

November 28, 2024

John Feneck: Gold Backdrop Looks “Amazing,” Plus 7...

April 22, 2025

Stallion Uranium Announces Flow-Through and Non-Flow Through Private...

August 6, 2025

Fortune Minerals Announces New Convertible Security Agreement With...

July 31, 2025

Crypto Market Recap: Bitcoin Breaks US$111,000, Trump Courts...

May 24, 2025

High-grade Figueira Resource Improves Financial Metrics of the...

October 22, 2024

What Was the Highest Price for Copper?

July 19, 2025

Freegold Provides 2025 Golden Summit Program Update

October 7, 2025

Appendix 4D and Half Yearly Accounts

February 27, 2025

High Grade Gold Mineralisation Extended at Music Well

March 6, 2025

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent

    • Top Iran prayer leader who dubbed protesters ‘Trump’s soldiers’ calls for executions amid ongoing unrest

      January 17, 2026
    • Trump launches phase 2 of Gaza peace plan — but Hamas disarmament remains the real test

      January 17, 2026
    • JD Vance to skip Munich summit after fiery 2025 clash with European leaders

      January 17, 2026
    • UNRWA officials lobby congressional staffers against Trump terrorist designation threat

      January 17, 2026
    • CIA director was in Venezuela to meet with acting President Delcy Rodríguez, official says

      January 17, 2026

    Categories

    • Business (1,146)
    • Investing (3,900)
    • Politics (4,758)
    • Stocks (1,155)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sportinvestorsleague.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2026 sportinvestorsleague.com | All Rights Reserved